FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Chapter 5 The College Today 5-A-3 May, 2023 Annapolis Hall – Building A Building Description Building Designation 1. Annapolis Hall – Building A Number of Floors 2 Net Assignable Square Feet 18,011 Gross Building Area - GSF 32,131 Net-to-Gross Efficiency 56.1% Year Constructed 1970 Renovations 1995, 2015 Additions Main Entrance 1994, Mechanical 1995, Interiors 2015, 2022 Contains Administrative offices General Condition good Adequacy of Space Generally adequate for functions housed in the building Sprinkler System Fully sprinklered Providing space for administrative offices, Annapolis Hall is one of the original campus buildings built in 1970. Previous renovations included the mechanical tower, knuckle extension to building B, and replacement of the roof system with a metal standing seam roof. An interior renovation was planned for 2021 with renovation drawing Bid Set issued in May 2021. Focus areas for capital renewal needs over a 10year period from 2023-2032 includes the following: • Exterior masonry sealant and cement board repair and recoating in the 3-4 year timeframe. • Exterior window/door replacement in the 3-4 year timeframe. • Interior finish renewal/upgrades (completion of 2021 planned renovations). Although the primary roof system (standing seam metal) was replaced in 1995, roof replacement for both the metal and flat singleply roof sections would fall outside the 10-year planning period. One of the three buildings A, B, and C that are informally linked to each other, the interior spaces and connection to building B are disorienting due to the angled relationship at the connecting knuckle. The front-and-rear opening elevator does not meet current code requirements.

RkJQdWJsaXNoZXIy MTc2ODM1