Frederick Community College Facilities Master Plan Chapter 5 The College Today 5-A-11 May, 2023 Conference Center – Building E Building Description Building Designation 5. Conference Center – Building E Number of Floors 1 Net Assignable Square Feet 13,586 Gross Building Area - GSF 22,939 Net-to-Gross Efficiency 59.5% Year Constructed 1999 Renovations 2020 Additions No additions Contains Conference rooms, classrooms, CEWD offices General Condition Good Adequacy of Space Adequate for functions housed in the building Sprinkler System Fully sprinklered The Conference Center was built in 1999 and the interior was renovated in 2020. The roof consists of both standing seam metal roof sections and flat, built up roof sections, both original. Focus areas for capital renewal needs over a 10year period from 2023-2032 includes the following: • Exterior masonry cleaning, sealing and sealant repair in the near-term, years 1-2. • Replacement of the flat, built-up roof sections in years 1-2. Renovations in 2020 provide much-needed, flexible, and larger instructional spaces. The standing seam metal roof sections were installed in 1999 and replacement would be expected to fall outside the 10-year planning period.
RkJQdWJsaXNoZXIy MTc2ODM1