FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Chapter 5 The College Today 5-A-14 May, 2023 Visual and Performing Arts Center – Building F Building Description Building Designation 7. Visual and Performing Arts Center – Building F Number of Floors 1 Net Assignable Square Feet 23,124 Gross Building Area - GSF 35,872 Net-to-Gross Efficiency 64.5% Year Constructed 1988 Renovations 2011-2014 music rooms, black box, other interior upgrades, 2022 film, video, graphics spaces Additions 2002 art room support areas, 2011 kiln building, Contains Theater, black box, and support spaces, music classrooms and practice rooms, visual arts studios, general purpose classrooms, art gallery, and offices General Condition Good Adequacy of Space Inadequate for functions housed in the building Sprinkler System Fully sprinklered The Visual and Performing Arts Center was built in 1988 and renovated in separate projects in 2011-2014. The roof as replaced (2014) with a single-ply roof membrane. Interior finishes have been renewed or replaced over the life of the Center. The rambling layout of the building is disorienting and not very efficient. Corresponding way-finding is inherently difficult. Space is insufficient for existing visual and performing arts programs, and students will find few gathering spaces to assemble and/or study. The theater is the largest assembly space with seating on campus. Focus areas for capital renewal needs over a 10year period from 2023-2032 includes the following: • Exterior masonry cleaning, sealing and sealant repair in the 4-6 year timeframe. • Replacement of the single-ply roof system in the 6-8 year timeframe. • Maintenance/repair of interior finishes with finish replacements in the 6-8 year timeframe. • Replacement of the heating/cooling distribution systems near the end of the 10-year study period. • Difficult access to server room, co-location of servers in electrical room, which is unconditioned.

RkJQdWJsaXNoZXIy MTc2ODM1