Frederick Community College Facilities Master Plan Chapter 5 The College Today 5-A-22 May, 2023 Mercer-Akre Kiln – Building K Building Description Building Designation 11. Mercer-Akre Kiln – Building K Number of Floors 1 Net Assignable Square Feet 897 Gross Building Area - GSF 960 Net-to-Gross Efficiency 93.4% Year Constructed 2011 Renovations No renovations Additions No additions Contains Ceramics kiln and storage space General Condition Fair Adequacy of Space Adequate for functions housed in the building Sprinkler System Not sprinklered The Mercer-Akre Kiln building was built in 2011 and houses the kiln and storage space. The building is of metal exterior construction with an unfinished interior and minimal utility service (electrical only), and a solar array providing supplemental power. The unconditioned building is remote from the ceramics studios in Building F. Focus areas for capital renewal needs over a 10year period from 2023-2032 include the following: • Routine maintenance of exterior finishes. • Repair/renewal of the solar energy controls.
RkJQdWJsaXNoZXIy MTc2ODM1