FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Chapter 5 The College Today 5-A-25 May, 2023 The Carl and Norma Miller Children’s Center – Building M Building Description Building Designation 13. Children’s Center – Building M Number of Floors 1 Net Assignable Square Feet 6,349 Gross Building Area - GSF 8,572 Net-to-Gross Efficiency 74.1% Year Constructed 1994 Renovations 2002, 2016 – full renovations, 2022 – finishes due to sprinkler leak Additions 2002, 2009 detached shed Contains Classrooms, work and break room spaces, offices General Condition Good Adequacy of Space Adequate for functions housed in the building Sprinkler System Fully sprinklered The Children’s Center was built in 1994 with an addition in 2003 and renovation in 2016. The building serves as a child-care center and consists of classrooms with individual toilet rooms, offices for staff, breakroom, small kitchen, and reception area. The most recent renovations included interior finishes. Focus areas for capital renewal needs over a 10year period from 2023-2032 includes the following: • Exterior masonry cleaning, sealing and sealant repair in the 8-10 year timeframe. • Interior wall, ceiling, and carpeted floor finish upgrades/replacements in the 4-6 year timeframe. • Domestic water heater replacement in approximately 10 years. The standing seam metal roof sections were installed in 1993 and 2003 and replacement would be expected to fall outside the 10-year planning period.

RkJQdWJsaXNoZXIy MTc2ODM1