FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Chapter 5 The College Today 5-A-27 May, 2023 Plant Operations – Building P Building Description Building Designation 14. Plant Operations – Building P Number of Floors 2 Net Assignable Square Feet 3,494 Gross Building Area - GSF 4,920 Net-to-Gross Efficiency 71.0% Year Constructed 1996 Renovations 2016 Additions 2003; 1980 – Community Center Storage shed Contains Vehicle storage and maintenance bays, maintenance shops, storage, offices, meeting / lunch room General Condition Fair Adequacy of Space Inadequate for functions housed in the building. Sprinkler System Fully sprinklered The Plant Operations building was built in 1996 with an addition in 2003 and renovation in 2016. The building is a steel framed, metal panel exterior Butler-style building with vehicle service bays on the lower level and Physical Plant offices on the second floor. The building does not provide sufficient or the most appropriate space for offices and maintenance shops; as more buildings are added to the campus, the need for more maintenance, storage and office space will continue to grow, correspondingly. Due to the extensive needs throughout the building for upgrade and expansion, a new replacement building is recommended.

RkJQdWJsaXNoZXIy MTc2ODM1