FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Executive Summary ES-14 May, 2023 Development programs that are currently offered at the Monroe Center facility to return to the FCC Main Campus. Site work includes reconfiguration of Parking Lot 5, resulting in a net loss of parking spaces; the pedestrian axis constructed as part of project 1 will be extended to the west campus loop road; and a landscaped plaza is planned for the new courtyard formed by Building C and the new Innovation and Technology Center. 4. Enrollment Services / Welcome Center • Estimated Size: Three Stories, 48,000 GSF, 27,400 NSF • Functions Included: All Student Services functions currently housed in Jefferson Hall, also including a new Welcome Center. • Budget Construction Cost: $31,708,705. This project represents a four-fold opportunity: 1) to better serve students related to student support services, improving those now housed in Jefferson Hall, 2) provide additional space currently needed for Student Services, 3) introduce a new Welcome Center near the ‘front door’ of the campus, and 4) allow for a relatively easy relocation of administrative functions to the Jefferson building. Associated site work includes realignment of a portion of the campus entry road west of the intersection with the CTC driveway, to provide a clearer circulation pattern. The building is located within the current Visitor Parking Lot, so a new lot has been proposed immediately north of the new Enrollment Services / Welcome Center building. In addition, completion of the pedestrian axis constructed as part of project 1 is anticipated from the interface location south of Linganore Hall to a new bus stop location on the loop road southeast of the new building. Refer to the following pages for these drawings: • Main Campus – Existing Conditions Plan • Main Campus – Ten-Year Campus Development Plan • Main Campus – Long Range Campus Development Plan

RkJQdWJsaXNoZXIy MTc2ODM1