Frederick Community College Facilities Master Plan Chapter 6 Recommendations, Campus Development 6-B-5 May, 2023 Building 4 Enrollment Services / Welcome Center Pedestrian Improvements This building will be constructed adjacent to the new pedestrian walkway created with the construc�on of Building 1. Parking and Driveways The new building is located within an exis�ng parking lot, and will result in a net loss of parking. This parking reduc�on will need to be coordinated with the City of Frederick as part of the Site Plan process to ensure that overall campus parking is not compromised by this parking reduc�on. A main component of this building will be the realignment of the entrance driveway into the campus. This will create a clearer approach into the campus, a dedicated area for visitors, and direct route to the loop road around the campus. This new entry route will allow for a dedicated area for users that arrive via the County Ride-On Bus system that will be connected to the pedestrian path constructed with Building 1. U�li�es Beyond connec�ng new u�li�es to the new building, the building will require the reloca�on of a storm drain system that serves the parking lots on the east side of Building H. Stormwater Management The new building and associated new impervious areas will be subject to water quality treatment in accordance with the requirements of MDE and the City of Frederick. Stormwater management should be accomplished through microscale prac�ces that are located near the area they are trea�ng to limit their size. These facili�es should be woven into the overall landscape plan for the site. Volumetric stormwater management is accomplished at the exis�ng dry pond at the front of the site. Potential Driveway at Summerfield Mechanical Services Except for Building 2, Campus Services Building, the HVAC systems of all buildings described above are expected to be served by below-grade piping generated at the Central Plant.

RkJQdWJsaXNoZXIy MTc2ODM1