FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Chapter 6 Recommendations, Campus Development 6-C-1 May, 2023 CENTRAL PLANT Several upgrades to the FCC central plant are anticipated to support the initial projects listed in the Facility Master Plan. The proposed updated to the central plant are discussed below and include deferred maintain upgrades, capacity upgrades to the chilled water system, capacity upgrades to the heating water system, as well as recommendations for upgrades in system efficiency and sustainability. It is recommended that upgrades to the central plant be considered during initial project #1, which also includes renovation to the athletic center (Building D). It is anticipated the central plant floor area will need to grow in order to accommodate the additional cooling and heating capacity of the campus. Table 1 below summarizes the estimated connected cooling load and heating loads that will be realized by the central plant after completion of the initial projects listed in the 2023-2033 Facilities Master Plan. It is anticipated that some existing facilities as well as new facilities will remain stand alone over the next 10 years and will not be connected to the central plant. Table 1 defines which facilities are assumed to be connected to the central plant and which facilities are anticipated to be stand alone. Table 1: Estimated Existing Campus Cooling and Heating Loads Building Occupancy Cooling Demand (Tons) Heating Demand (MBH) Comments A Annapolis Hall Office 55 725 B Braddock Hall Academic 65 740 C Catoctin Hall Academic / Lab 120 1,165 D Athletics Center Athletics 75 900 E Conference Center Academic / Office 40 555 F Visual & PA Center Academic / Lab 130 1,270 H Student Center Academic / Office 145 2,015 L Linganore Hall Academic / Office 110 1,510 1 Wellness, Athletics and Recreations Athletics 230 2,285 New Building 3 Biotechnology Center Science and Technology 180 1,8770 New Building S Sweadner Hall Support 10 100 Standalone HVAC G Gambrill Hall Office 40 550 Standalone HVAC J Jefferson Hall Office 40 550 Standalone HVAC K Mercer-Akre Kiln Lab 5 40 Standalone HVAC M Children’s Center General Use 25 255 Standalone HVAC P Plant Operations Support 20 225 Standalone HVAC 2 Plant Operation Support 40 515 New Building Standalone HVAC 4 Enrollment and Welcome Center Office 95 1,095 New Building Standalone HVAC

RkJQdWJsaXNoZXIy MTc2ODM1