FCC Facilities Master Plan May 2023 - Compressed (1)

Frederick Community College Facilities Master Plan Chapter 6 Recommendations, Campus Development 6-D-2 May, 2023 Innovation and Technology Center • Additional electronic access control doors will be required at entrances, classrooms, conference rooms and telecommunications rooms. • Security cameras will be required at entrances and exits, stairwells and hallways. Enrollment Services / Welcome Center • Additional electronic access control doors will be required at entrances, classrooms, conference rooms and telecommunications rooms. • Security cameras will be required at entrances and exits, stairwells and hallways. Telecommunications Structured Cabling System General campus wide recommendations for Telecommunications Structured Cabling Systems. • Each building has one point of entry for networking connectivity. Industry best practices and peer institutions recommend two (2) points of entry for redundancy. The long-term value vs. cost of including redundancy should continue to be considered by the College. • Telecommunications optical fiber cabling shall be included in all future projects connecting back to building L data center. • The College should develop an approach and process to address disaster recovery plans as relating to the campus network, distribution, and data integrity. • Shipping and receiving space and a dedicated storage space for networking equipment, PC’s should be created to secure valuable equipment. • The campus paging system, Blue emergency phones and call boxes in the garage should be replaced. • Red phones should be updated for consistency throughout the campus. • An additional carrier connection to the campus should be considered for redundancy. Recommendations for the four campus buildings in the 10-year planning horizon are as follows. Health & Wellness Building • This building connects to building D. The project will also include a complete renovation of building D. • Redundant OSP cabling should be added as part of this project. • Any telecommunications conduits that currently run under the renovation areas will need to be moved at time of renovation. • Additional "blue" lights phones may be required. Campus Services Building • Would require a fiber connection to building L. • Redundant OSP cabling should also be added as part of this project. • Any telecommunications conduits that currently run under the renovation areas will need to be moved at time of renovation. • Additional "blue" lights phones may be required.

RkJQdWJsaXNoZXIy MTc2ODM1