dumpster enclosure gates - 6' tall gates; (2) 10' wide double gates ls 1.00 $25,000.00 $25,000.00 Miscellaneous surveying ls 1.00 $15,000.00 $15,000.00 temp construction fence and gate-rental- install, maintain and remove ls 1.00 $10,000.00 $10,000.00 300 CONCRETE $211,200.00 Concrete concrete-office sf allowance 9600.00 $15.00 $144,000.00 concrete-storage sf allowance 4800.00 $14.00 $67,200.00 400 MASONRY $480,000.00 Masonry masonry-office sf allowance 19200.00 $20.00 $384,000.00 masonry-storage sf allowance 4800.00 $20.00 $96,000.00 500 METAL $1,152,000.00 Structural Steel and Miscellaneous Metals structural steel and miscellaneous metals-office sf allowance 19200.00 $50.00 $960,000.00 structural steel and miscellaneous metals-storage sf allowance 4800.00 $40.00 $192,000.00 600 CARPENTRY $322,800.00 Carpentry-Rough carpentry-office sf allowance 19200.00 $3.00 $57,600.00 carpentry-storage sf allowance 4800.00 $2.00 $9,600.00 Cabinetry and Millwork cabinetry and millwork-office sf allowance 19200.00 $10.00 $192,000.00 cabinetry and millwork-storage sf allowance 4800.00 $2.00 $9,600.00 Installations install doors, frames and hardware sf allowance 24000.00 $1.50 $36,000.00 carpentry labor to install accessories and miscellaneous sf allowance 24000.00 $0.75 $18,000.00 700 MOISTURE PROTECTION $770,400.00 Roofing roofing-insulation, board-membrane-flashings and sheetmetal/roof hatch/mechanical screening and accessories-0ffice sf allowance 9600.00 $45.00 $432,000.00 roofing-insulation, board-membrane-flashings and sheetmetal/roof hatch/mechanical screening and accessories-Storage sf allowance 4800.00 $45.00 $216,000.00 Sealants caulking of windows and expansion joints-interior and exterior included below sf allowance 24000.00 $1.25 $30,000.00 Waterproofing waterproofing sf allowance 24000.00 $1.00 $24,000.00 Fireproofing and Firestopping fireproofing-office sf allowance 19200.00 $2.00 $38,400.00 fireproofing-storage sf allowance 4800.00 $2.00 $9,600.00 firestopping-office sf allowance 19200.00 $1.00 $19,200.00 firestopping-storage sf allowance 4800.00 $0.25 $1,200.00 Insulation exterior wall insulation see cat 900 0.00 $0.00 $0.00 800 DOOR, WINDOW, GLASS $504,000.00 Doors, Windows, Glass and Glazing doors, windows, glass and glazing-office sf allowance 19200.00 $25.00 $480,000.00 doors, windows, glass and glazing-storage sf allowance 4800.00 $5.00 $24,000.00 900 FINISH $1,180,800.00 Partitions gwb partitions-average price-office sf allowance 19200.00 $12.00 $230,400.00 gwb partitions-average price-storage sf allowance 4800.00 $6.00 $28,800.00 Light Gage Exterior Wall -Assembly-backup to veneers 6" steel studs-structural-sheathing-insulation-vapor barrier-gwb-finished sf allowance 24000.00 $10.00 $240,000.00 Painting painting-office sf allowance 19200.00 $3.00 $57,600.00 painting-storage sf allowance 4800.00 $2.00 $9,600.00 Flooring floor prep sf allowance 24000.00 $1.50 $36,000.00 flooring allowance-office sf allowance 19200.00 $15.00 $288,000.00 flooring allowance-storage sf allowance 4800.00 $5.00 $24,000.00 Ceramic Tile ceramic tile walls- office sf allowance 19200.00 $3.00 $57,600.00 Ceilings ceiling allowance-office sf allowance 19200.00 $8.00 $153,600.00 bulkhead allowance-office sf allowance 19200.00 $1.00 $19,200.00 ceiling allowance-storage sf allowance 24000.00 $1.00 $24,000.00 bulkhead allowance-storage not required 0.00 $0.00 $0.00 10 of 20

RkJQdWJsaXNoZXIy MTc2ODM1